First | 1 | 2 | 3 | 4 | 5 | Last Records 1 - 10 of 112 |
|
|
URS provided civil, mechanical and electrical engineering services for a multistory residential and retail development in the English south coast town of Southampton. Wilson Bowden Developments, who specializes in town More |
|
|
Adrienne Arsht Center for the Performing Arts of Miami-Dade County URS provided program management and construction administration services on the Adrienne Arsht Center for the Performing Arts of Miami-Dade County. This high-profile performing arts center anchors the newly emerging Arts and Entertainment More |
|
|
Suddenly sports fans in Detroit's Ford Field Football Stadium have an upscale, new alternative to standard stadium fare, thanks to the arrival of a 1,500-square-foot AH!Mooré Gourmet Coffee & Bakery. The distinctively stylish café is part More |
|
|
Alameda County Medical Center, Highland Campus Construction of the Highland Campus’ new Critical Care and Clinic building and parking structure involved a number of difficult challenges. The structure is located on a compact triangular-shaped hillside site in a densely populated area. More |
|
|
Alexandria International Airport URS’s comprehensive master plan for the Alexandria International Airport established an aggressive capital development and implementation program that maximizes commercial opportunities created by the facility’s location in the center of More |
|
|
URS is providing owner’s representative services to the City of Orlando for the new Amway Center. Scheduled to open in fall 2010, the new $380-million venue will be home to the NBA’s Orlando Magic, and will host major national events, More |
|
|
Arena District Office Building This new mixed-use facility provides four levels of office space and ground-level retail space in downtown Columbus’ thriving Arena district. As the initial building in the Master Plan development area, the challenge was to design a More |
|
|
Winner of the 2007 Award for Design Excellence from the Boston Society of Architects URS provided project management, construction management and commissioning services for a new, $39.5 million high school in More |
|
|
URS provided civil and structural engineering design for this redevelopment in Romford town centre, northeast London. Barratt East London entered into a joint venture with The Mall Corporation for the £25m redevelopment of this site in More |
|
|
Baltimore/Washington International Airport Terminal URS was chosen to provide design and planning services for the development of a seamless and completely integrated terminal expansion within a site severely constrained by the proximity of the existing airfield and landside More |
|










