Records 1 - 10 of 14 |
|
|
Baku-Tbilisi-Ceyhan & South Caucasus Pipeline Since 2000, URS has been providing design and construction services for BP on two major pipelines in Eurasia. The 1,100-mile-long Baku-Tbilisi-Ceyhan crude oil pipeline spans three countries, Azerbaijan, Georgia and Turkey, ending at the More |
|
|
ConocoPhillips – Lost Cabin Gas Plant URS progressively designed and built a three-train gas plant at Lost Cabin, Wyoming, for ConocoPhillips and was solely responsible for all aspects of grass roots facilities’ engineering and construction – conceptual design through More |
|
|
When a solution was needed to protect a new LNG terminal off the coast of Baja California in Mexico from the swells and storms of the Pacific Ocean, URS was selected as the lead designer for the construction of an offshore caisson More |
|
|
Gas TransBoliviano Natural Gas Pipeline - Environmental/Cultural Management Program URS applied award-winning environmental planning and management expertise to reduce adverse environmental and social impacts of the Bolivia-Brazil Natural Gas Pipeline. The 3,056-kilometer pipeline is one of the continent's largest and More |
|
|
Gladstone Liquefied Natural Gas Project In Queensland, Australia, URS provided environmental consultancy services for the Gladstone Liquefied Gas Project. The multi-billion dollar project encompassed three main components: coal seam gas fields, a 435-kilometer gas transmission More |
|
|
Greenfield Oil and Gas Project In Western Australia, URS was selected to manage a comprehensive range of marine and terrestrial environmental impact assessment studies for a proposed Greenfield oil and gas facility, as well as the upstream and downstream facilities. More |
|
|
KeySpan Energy - Natural Gas Pipeline Design URS provided engineering design services for KeySpan Energy for the construction of a natural gas pipeline lateral, which was installed in Londonderry, New Hampshire. The high-pressure pipeline lateral connected an existing More |
|
|
URS performed services for the complete installation and hydro testing of 8400 meters of 24 inch steel pipeline within the city limits of Lloydminster, Alberta. This four-month-long, project involved work in a highly congested area, More |
|
|
Pipeline Installation in Pennsylvania URS mobilized equipment and crews to the Pennsylvania area to replace a competitor that was not performing up to client’s safety standards. URS was contracted to install varying lengths of 6-inch to 20-inch pipe in very challenging More |
|
|
Pipeline Installation Project near Bonnyville, Alberta Pipe ranging from 20-24 inches was installed for a major oil sands producer near Bonnyville, Alberta. The project scope included for 30 kilometers of right-of-way and 60 kilometers of pipe installation for brackish lines and emulsion More |
|










